How much process does this change need?

A button label change turns into pages of planning. A payment redesign reaches implementation before anyone agrees on the rules. Both waste effort: the first adds unnecessary ceremony; the second makes an uncertain decision expensive.

Assess risk and uncertainty first

Describe the expected change, who it affects, and what you still need to learn. Make and verify a small, clear change directly. Start medium or large changes with /grill-with-docs; consider /grill-me when there is no codebase to inspect.

Escalate to /wayfinder for complex decisions spanning sessions. These names identify skill entry points. Check whether your environment provides them before using them; this site does not execute the workflow for you.

Choose by risk and uncertaintyA hierarchy diagram generated by Archify.Choose by risk and uncertaintyThis changeImplement +verifySmall and clear/grill-with-docsMedium or largeConsider/grill-meNo codebaseUse /wayfinderComplexcross-sessiondecisionsDecision basisUse expected change and uncertainty, notproject size.
Risk and uncertainty determine how much process is needed.

Follow the artifacts through the main chain

The typical chain runs through alignment, a spec, implementation tickets, implementation, review, and a PR. Each step consumes an earlier result. If an input is missing, record the gap so it remains visible.

StepInputResult
AlignmentAn unclear requestConfirmed decisions
SpecSettled decisionsGoal, behavior, exclusions, verification
Implementation ticketsA specIndependently verifiable vertical capabilities
ImplementationA bounded ticketA change passing relevant checks
ReviewThe change and its referencesSeparate requirements and standards conclusions
PRReview and behavior evidenceChange overview, before/after evidence, merge risk

A decision map carries a different job

/wayfinder connects decision tickets through a map index, dependencies, and open questions. Those tickets establish choices. Later, /to-tickets produces implementation tickets that describe small working capabilities.

Move from the map into specifications and implementation as needed. Planning does not imply permission to change production. A person still confirms the goal and scope, and an expanding map can itself become maintenance work.

From alignment to a reviewable PRA workflow diagram generated by Archify.From alignment to a reviewable PRAlignIn: unclear requestOut: confirmed decisionsSpecifyIn: settled decisionsOut: goal, behavior, exclusions,verificationTicketIn: specOut: independently verifiable verticalsliceImplementIn: bounded ticketOut: change passing relevant checksReviewIn: change + referencesOut: requirements + standardsconclusionsPRIn: review + behavior evidenceOut: overview, before/after evidence,merge risk/wayfinderMap index · dependencies · openquestionsDifferent ticket rolesDecision tickets ≠ implementation tickets;commands are entry points.Spec: goals, behavior, exclusions andacceptance.PR: overview, before/after evidence and mergerisk./wayfinder → SpecifyCross-session decisions
Each workflow step has an input and a verifiable output.

Read advice with its date attached

January 2026 emphasized Ralph and AFK. Spring brought grilling and prototypes. July introduced the naming chain below; October put more weight on review and retrospectives. The July post records one stage in that evolution.

/wayfinder -> /to-spec -> /to-tickets -> /implement -> /code-review

— Matt Pocock

By October 8, the advice was no longer to begin with /wayfinder by default. When reading an earlier workflow, establish its task and conditions before applying it today.

How the workflow evolvedAn event timeline generated by Archify.How the workflow evolved2026-01 Ralph / AFKEarly workflowSpring: grill / prototypesQuestions and cheap prototypes2026-07 New namesNew names: wayfinder, spec, tickets,implement, review2026-10 Review + retrosDo not default to /wayfinderDate precisionJanuary and spring are broad phases; axisdates are placement anchors.Matt Pocock · 2026-07-02Source link: see the matching candidate.Time scaleVertical spacing is proportional to candidatedates; phase dates are placement anchors.
Workflow advice evolves as tools and experience change.

Exercise: select three starting points

TRY IT

Choose enough process

  • Task: pick a first step for a button label edit, a payment redesign, and a poorly understood legacy migration.
  • Deliverable: name the risk, unknowns, and next artifact for each.
  • Check: could equally sized projects still require different paths?
Suggested approach

Make and verify the clear label edit. Inspect payment behavior and align on tradeoffs before redesigning. Investigate the legacy system; add a map if interdependent decisions span sessions. Judge the change and uncertainty.

What counts as done?

Choose a path for one task and state what would justify escalating it. The first step has a concrete output, and unconfirmed choices remain open. A sequence of skill names alone does not establish either.

Practice alignment and prototypes, or take settled choices into specs and tickets.

Quick reference

01

Small and clear

Make the change and verify its behavior.

02

Important unknowns

Investigate, ask for a decision, or prototype.

03

Decisions across sessions

Use a map when needed and confirm scope before implementation.

Sources

Independent, unofficial, noncommercial study notes. This site has no affiliation with or endorsement from Matt Pocock. Referenced works belong to their authors; MIT reuse carries separate copyright and license notices.